
Network Connection Work Sydney
Electrical network connection work Sydney — new property connections, supply upgrades, network application & connection. Level 2 ASP. Ausgrid & Endeavour Energy. All Sydney suburbs.
Connecting a new property to the electrical network, upgrading an existing connection's capacity, or separating supply for a newly subdivided lot all require a Level 2 ASP to perform the network connection work on behalf of Ausgrid or Endeavour Energy. Tradie Heroes manages the complete network connection process — from initial application and design to installation and energisation — across all Sydney suburbs.
We handle connections for new residential subdivisions, knock-down rebuilds, granny flat additions requiring separate meters, commercial property connections and temporary construction supplies. Our Level 2 ASP status with both Ausgrid and Endeavour Energy means we can manage the process through to energisation without the property owner needing to engage the network directly.
What's Included
- New property connection to Ausgrid & Endeavour Energy network
- Network capacity upgrade (larger service amperage)
- Subdivision — separate connection for new lots
- Granny flat & dual occupancy separate metering
- Commercial & industrial connection applications
- Construction temporary supply installation
- Network application & technical documentation management
- Through to energisation — single point of contact
Frequently Asked Questions
How do I get a new electricity connection for my Sydney property?
New connections require a network application to Ausgrid or Endeavour Energy, a Level 2 ASP to install the service connection, and a licensed electrician to complete the internal wiring. We handle all these components — you just need to tell us what you're building.
How long does a new network connection take in Sydney?
Network connection timeframes depend on the network operator's schedule and supply availability. Simple residential connections typically take 4–8 weeks from application to energisation. We manage the process and keep you updated throughout.
Can I get a separate power connection for my granny flat?
Yes — a granny flat can have a separate meter and connection, which allows independent billing for the occupant. This requires a Level 2 ASP to install and separate metering. We handle the complete process.
What is the cost of a new network connection in Sydney?
Ausgrid and Endeavour Energy charge a network connection fee that varies based on connection type, capacity and location. Level 2 ASP work costs are quoted by us before starting. We provide a complete estimate covering all components.
Can you provide a temporary power supply for a construction site?
Yes — we install temporary supply points for construction sites across Sydney, including the network connection, temporary meter box and distribution board. This is often required before building work can begin.
Sydney Service Areas
We service all Sydney suburbs — call to confirm availability in your area.
Need a Level 2 Electrician?
Ausgrid & Endeavour Energy approved ASP — all Sydney suburbs.